Case Studies

Real Utilities. Real Networks. Real Results.

The utilities who deploy Neara aren't running demos. They're running their businesses on the twin. Here's what they've unlocked.

View customer stories
3x faster power restoration
50% reduction in grid hardening costs
10x faster structural load analyses
2x more existing network capacity
SA Power NetworksEndeavour EnergyEssential EnergyESB NetworksCenterPoint EnergyPortland General ElectricOncorXcel EnergyScottish and Southern Electricity NetworksHEDNO, Hellenic Electricity Distribution Network Operator
Featured Case Study

Essential Energy doubles network capacity without new infrastructure

Read the story
Essential Energy doubles network capacity without new infrastructure
2x Unlocked network capacity
100% Network coverage
12 weeks Time to production twin

"By modelling each span individually, we found that in many parts, capacity is twice as high as we previously thought."

John Cleland, CEO, Essential Energy

Read the story
Endeavour Energy transforms its flood emergency response

Endeavour Energy transforms its flood emergency response

  • 76% Faster re-energization
  • 300 Manual inspection hours saved
  • 100% Network flood coverage
Read the story
A US utility cuts SAIDI by 8% with risk prioritization
US Utility

A US utility cuts SAIDI by 8% with risk prioritization

  • 8% SAIDI reduction
  • 20x Faster risk analysis
  • $B+ Capital confidently allocated
Read the story

More case studies

Structural

How to deliver PLA 20× faster and expand network coverage

A large Texas utility compressed months of pole loading analysis into days across more than 2 million poles.

  • +2 million Poles analyzed network-wide
  • 20x Faster pole loading analysis
  • 10x Expanded network coverage
Structural

How Empact conducts per-pole loading analysis 3× faster

Neara helped Empact Engineering deliver for utility clients faster, saving millions of dollars while meeting regulatory commitments.

  • 12x Increase in poles modeled per month
  • 65% Reduction in time spent per pole
  • 3x Faster per-pole loading analysis
Grid Capacity

How one utility unlocked nearly 3,000 MW of renewable energy

A major Australian utility used Neara to accelerate transmission design and unlock hidden capacity for renewable energy integration.

  • 2x Faster completion of design work
  • 3,000 MW Of renewable energy unlocked
  • >350 km Of renewable energy zone traversed
Storm & Resilience

How SAPN re-energized 76% faster post-flood

SA Power Networks cut re-energization time by 76% using Neara's network-wide flood modeling during a major storm event.

  • 76% Faster re-energization post-flood
  • 21k Powerline spans analyzed in 15 minutes
  • 0 Reports of electric shock throughout the flood
Asset Management

Utility defers 25,000 pole replacements

A physics-verified risk scoring model helped an Australian utility prioritize pole remediation beyond age-based methodology.

  • 84% Reduction in projected pole replacements
  • 10x Faster risk identification
  • 25,000 Pole replacements deferred
Risk & Resilience

How one utility identified conductor clash risks 89% faster

An Australian utility completed a network-wide conductor clash risk project in 4 months, down from a projected 36.

  • 89% Reduction in project duration
  • 4 months To identify and resolve conductor clashing
  • 10x Faster conductor clash risk identification

See what Neara can do for your network.

Join the utilities already running their networks on a physics-enabled digital twin.