Case Study: Transmission Design
An Australian Utility completed transmission planning, design, and drawings in less than 2 weeks using Neara's 3D modeling platform.
An Australian Utility completed transmission planning, design, and drawings in less than 2 weeks using Neara's 3D modeling platform.
Neara helped a utility save millions using predictive modeling to identify 25k+ poles that had unnecessarily identified as needing to be retired, without compromising safety.
Learn how Neara's digital modeling accelerated resolution of conductor clashing issues for an Australian utility, ensuring rapid compliance and grid resilience.
Growing complexity in EMPACT’s scope revealed the limitations of legacy technology solutions that worked in the past but proved ill-equipped to confront today’s challenges.
As a flood emergency unfolded, the utility approached Neara for an urgent solution to diagnose and minimize the flood’s impact on customers, communities and network health.
Using Neara’s 3D digital network model, Essential Energy discovered that they could double the energy capacity across their existing network.
SA Power Networks partnered with Neara to assess network damage and risk through digital flood impact modeling.
The utility has saved hundreds of field visits, identifying and prioritizing vegetation risks up to 10x faster than they previously could.
A large Australian utility with >150k kilometres ( > 90k miles) of network under management and over one million poles partnered with Neara to better understand their assets.
Schedule a demo today, and gather the insights you need.
Get a Demo