News 10: South Australian Power Networks Utilizing Neara’s Network Modeling
A Powerful Tool for Electric Utilities
SA Power Networks used our AI-powered modeling capabilities to bring power line regeneration times down from three weeks to just five days, analyzing 21,000 power line spans in just 15 minutes.
Neara’s 3D modeling allowed SA Power Networks to simulate how power lines, poles, and other assets were being impacted by flood conditions, predicting where and when power lines might breach clearances, require disconnection or be clear for re-energization.
And, as the river levels have returned to normal, the modeling has been used to assist in planning the reconnection of supply along the river.
Watch the segment below:
Want to learn how Neara could benefit your team? Use the button below to reach out: